Hydraulic analysis of the Upper Northwest Interceptor Sections 5 And 6

Show simple item record

dc.contributor.advisor Hwang, Ralph B. en_US
dc.contributor.author Donohue, Deana Lynn
dc.date.accessioned 2010-06-08T16:31:48Z
dc.date.available 2010-06-08T16:31:48Z
dc.date.issued 2010-06-08T16:31:48Z
dc.date.submitted 2009-12-04
dc.identifier.uri http://hdl.handle.net/10211.9/95
dc.description Project (M.S., Civil Engineering (Water Resources)) -- California State University, Sacramento, 2009. en_US
dc.description.abstract Project Overview The Upper Northwest Interceptor Sections 5 and 6 (UNWI 5/6) are part of a regional gravity sewer system designed and constructed to relieve the capacity deficiencies in the north eastern portion of Sacramento County. Sacramento Regional County Sanitation District (SRCSD) defines an interceptor as any pipe that conveys greater than 10 million gallons per day (mgd) of sewage. The UNWI system conveys flows to the regional wastewater treatment plant in Elk Grove, located in the southwestern portion of Sacramento County. UNWI 5/6 is a 5.5-mile gravity interceptor located along Elkhorn Boulevard starting at Don Julio Boulevard and terminating at Cherry Lane to the west. The interceptor diameter is 48 and 66-inch to convey an ultimate flow of 80.6 mgd. Currently, the interceptor conveys much less flow than 80.6 mgd and interim flows were considered during design. This project also includes the design of two hydraulic control structures to channelize and direct flow during low flow periods in the near-term and redirect flow during periods of maintenance or high flow. This paper will describe the hydraulic design criteria and process for design of UNWI 5/6 project components including the interceptor and hydraulic control structures. This interceptor project has been constructed and is currently in operation. en_US
dc.description.sponsorship Civil Engineering (Water Resources) en_US
dc.language.iso en_US en_US
dc.subject Hydraulics en_US
dc.subject Interceptor en_US
dc.subject Sewer en_US
dc.title Hydraulic analysis of the Upper Northwest Interceptor Sections 5 And 6 en_US
dc.type Project en_US

Files in this item

Files Size Format View Description
Final Graduate Project_120309_donohue.doc 2.487Mb Microsoft Word View/Open HYDRAULIC ANALYSIS OF THE UPPER NORTHWEST INTERCEPTOR SECTIONS 5 AND 6 (word)
Final Graduate Project_120309_donohue.pdf 860.3Kb PDF Thumbnail HYDRAULIC ANALYSIS OF THE UPPER NORTHWEST INTERCEPTOR SECTIONS 5 AND 6 (pdf)

This item appears in the following Collection(s)

Show simple item record



Advanced Search

Browse

My Account